Work Order Late Start

Work orders that are ready but have never been started (empty start date), drawn as a timeline. For catching skipped work before its deadline passes.

Questions It Answers

Filters

Filter What it does
Division Pre-filled from the user role's default division. A role locked to one division cannot change it.
Department Limits to one department (warehouse/outlet) inside the division; pre-filled from the role default when set.
Deadline in Days Days between the deadline and today: positive not yet due, negative overdue. E.g. <= 3 for those due within three days, < 0 for late ones.
Status Default Ready for Production - work orders allowed to start. Only those with an empty Start Date show, whatever the status.

How To Read It

The result is a timeline chart, not a table: one row per work operation, its bar spanning Order Date to Expected Completion Date, labelled with the production order number. The same data (ordered, failed, produced quantities) is carried but not shown as columns.

The chart is for reading on screen; its export is an image, not figures.

Why The Result May Be Empty