Production Nearing Deadline

Running production orders approaching their deadline, drawn as a timeline per product. For the morning production meeting.

Questions It Answers

Filters

Filter What it does
Division Pre-filled from the user role's default division. A role locked to one division cannot change it.
Department Limits to one department (warehouse/outlet) inside the division; pre-filled from the role default when set.
Deadline in Days Days between the deadline and today: positive not yet due, negative overdue. E.g. <= 3 for those due within three days, < 0 for late ones.
Status Default In Production; change it to see other statuses.

How To Read It

The result is a timeline chart, not a table: one row per product, its bar spanning Order Date to Expected Completion Date, labelled with the production order number. The same data (ordered, failed, produced quantities) is carried but not shown as columns.

The chart is for reading on screen; its export is an image, not figures.